Skip to content
A conveyor discharging onto a stockpile of bulk aggregate at a quarry.

Bulk commodities

Aggregates and construction materials

Crushed stone, gravel and sand to specification

A freight trade rather than a product trade. Aggregate is cheap per tonne and heavy, so almost the entire delivered cost is transport, and the commercial skill lies in matching parcel size to vessel and to discharge capability.

They also serve a scheduling purpose: aggregate fills tonnage on legs where the fertilizer flow runs one way, which is what makes the round trip economic on several of our corridors.

Specification

Technical data

Materials
Crushed stone, gravel, sand, limestone filler
Standards
EN 12620 (concrete), EN 13043 (bituminous mixtures)
Fractions
0/2, 2/8, 8/16, 16/32 mm and to specification
Bulk density
1.35–1.60 t/m³ depending on material and fraction
Los Angeles coefficient
Per material — declared on the test certificate
Fines content
Per fraction and standard
HS code
2517 / 2505 per material
Transport status
Not classified as a dangerous good

Classification, HS code and transport regime are confirmed per grade and per route at the offer stage. Figures below are indicative of the standard specification.

Packaging

  • Bulk, in holds, hopper wagons, tippers and walking floors
  • Big bag 1000 / 1250 kg for site delivery of smaller quantities

Storage and handling

  • Open stockpiling is normal; segregate fractions to prevent mixing
  • Protect fine fractions from wind loss and from contamination by soil
  • Drainage under the stockpile — waterlogged material fails its moisture specification

Transport

  • Unregulated for transport by road, rail and sea
  • Loading rate and discharge capability decide the economics — confirmed before fixture

Documents

  • Technical data sheet (TDS) — issued with the offer
  • Safety data sheet (SDS) in the languages of transit and destination
  • Certificate of analysis, lot-specific, drawn at loading
  • Certificate of origin and EUR.1 where the destination allows preference

Documents are issued against a confirmed enquiry rather than published for download — an SDS is only meaningful for the grade and revision actually shipped.

Commercial terms

How it is quoted

Incoterms
FCA, FOB, CIF, DAP, CPT
Typical lot size
From 1,000 t; 5,000–50,000 t in bulk
Lead time
2–4 weeks from contract

Request a quote

Aggregates and construction materials

Send quantity, delivery terms and destination and a trader will come back with a firm offer within 24 hours on working days. No price is published — every quote is prepared per shipment.